Network Planning Dashboard

Sample scenario · Metropolitan rollout · Sub-6 + mmWave + THz pilot

LIVE
Sign in
No live scenario loaded. Showing sample KPIs. Open the RF Simulator to run a real network and see live numbers here.
Open Simulator

Network KPIs

Sample scenario · last refresh 2m ago

Planned Sites
64
Coverage
92.4%
Avg RSRP
−92dBm
Avg margin
11.8dB
Throughput
486Mbps/user
Total demand
2400Mbps
Users
120
High-band users
18
Overloaded Cells
5
Insufficient
3
CAPEX
$12.8M
estimate
AI Score
78/100

Aggregate Throughput by Layer

24h profile · Mbps

Technology Mix

Sites by layer

FR1 410 MHz – 7.125 GHz · BW ≤ 100 MHz
FR2 24.25 – 71 GHz · BW 50 / 100 / 200 / 400 MHz
6G THz: experimental / pilot only

AI Planning Copilot

rule-based
3 active recommendations
high priority

Add 2 mmWave small cells along Marina Blvd

Sector 14B at 87% load during peak. Sub-6 macro cannot offload — recommend 28 GHz hotspots with IAB backhaul.

+18% capacity · −9% interference
medium priority

Downtilt Site SUB-07 by 2°

Overshoot into neighbor cluster causing −3 dB SINR drop in Zone 4. Mechanical tilt adjustment, no CAPEX.

+1.4 dB SINR · zero cost
low priority

Pilot THz cell for XR lab (Building H)

Indoor LOS, 30m radius, 10 GHz BW. Suitable experimental zone with controlled blockage.

+12 Gbps peak · pilot only